Spare parts

  • Conveyor belts
  • Elevator belts and buckets
  • Gear motors
  • Bearings
  • Chains
  • V-belts
  • Screens
  • Product piping
  • Aspiration piping
  • Wear protection
  • Slide coatings
  • Any kind of wear parts

Maintenance and repair of all products

  • Inspection
  • Maintenance
  • Revision
  • Plant optimization

Explosion protection documentation and zone classification

Ex zone analysis incl. Ex zone plan

  • Used materials (material data, quantity, explosion figures)
  • Brief description of system and process technology
  • Tabular documentation of expected zones 20, 21 and 22 during operation (areas in which a potentially explosive atmosphere is likely to occur)
  • Description of the explosion protection measures taken / required (technical, structural and organizational protection measures)

Building application

  • Preparation of the building application documents for the architect (load data, load points, traffic areas)
  • Development of a proposal for the building geometry in the area of the processing plant
  • Plant and business description with plant drawing and flow diagram for product, aspiration and compressed air
  • Preparation of a "Consideration of potentially explosive areas" and an Ex zone classification with Ex zone plan

Plant projection in 3D

  • Proposal for building geometry in the machine areas
  • Systematic listing of the whole technical equipment
  • Compilation of projection results in tabular form
  • 3D plant models with appropriate 2D deductions
  • Flow diagram for the seed processing plant
  • Forecast for media usage (electrical supply - based on a motors and sensors list, compressed air, water, wastewater, inlet air, outlet air) including a positioning proposal for the aggregates (compressor plants, filter plants) respectively for connection points of feeding and waste disposal lines in the building (water supply, wastewater removal, gas supply for drying plant)

Plant optimization

  • Analysis of existing plants and their components
  • Proposal for optimization of material flow (product, aspiration, etc.)
  • Proposal for a reduction of operating facilities and emissions (compressed air, energy, outlet air, dust, noise, etc.)

Installation works and supervision

  • From installation start until plant start up
  • Supervision and coordination by our own fitters
  • Complete installation works or instruction of fitters provided by the customer